Road

Pacific Motorway Upgrade

Pacific Motorway Upgrade Project Overview This ECI project involved the design and reconstruction of the Pacific Motorway between Springwood (South) and Daisy Hill. The upgrade consisted of widening the motorway to 6 lanes with the future ability to extend to 8 lanes, including a major multi-level interchange at Loganlea Road and associated service roads to

Pacific Motorway Upgrade Read More »

Houghton Highway Duplication

Houghton Highway Duplication Project Overview This project involved the construction of a new 2.753km bridge between Brisbane and Redcliffe, with the new bridge located 35m east of the existing Houghton Highway Bridge. The new bridge features three traffic lanes, a pedestrian/cycle path and a dedicated fishing platform. It was designed to withstand a 1 in

Houghton Highway Duplication Read More »

Maroochy River Bridge Duplication

Maroochy River Bridge Duplication Project Overview A pilot project in conjunction with QLD Department of Main Roads to utilise the Early Contractor Involvement (ECI) form of contract delivery. In cooperation with the bridge designers KBR and Superintendent GHD, the project consisted of the construction of a new 13 x 31m span bridge, and the widening of the

Maroochy River Bridge Duplication Read More »

Caboolture Northern Bypass

Caboolture Northern Bypass – Stage 2 Pumiceston Road Interchange Project Overview The Caboolture Northern Bypass Project was for the Department of Main Roads which involved the construction of the D’Aguilar Highway from west of Beerburrum Road to east of Lagoon Creek. This project was designed to reduce the through traffic, especially heavy haulage vehicles, in

Caboolture Northern Bypass Read More »

Centenary Link Alliance

Centenary Link Alliance Project Overview The project consisted of design and construction of Centenary Link between Ipswich Motorway and Garden Road at Richlands, for the Department of Transport and Main Roads (TMR). A four lane dual carriageway (plus localised widening where necessary and future provision for six lanes by widening into the median) and a

Centenary Link Alliance Read More »

Port of Brisbane Flyover

Port of Brisbane Car Precinct Flyover – Fisherman Island Project Overview JF Hull joined with CW-DC Pty Ltd for this design and construct project for the construction of a 15 span bridge. The bridge was part of the relocation of imported car storage from Hamilton to Fisherman Island and joined Wharves 1 and 2 to

Port of Brisbane Flyover Read More »

Eenie Creek Road – Stage 2

Eenie Creek Road Stage 2 Project Overview Eenie Creek Road Project was an initiative between Queensland Department of Main Roads and Noosa Council. The project was necessary due to the growth and popularity of the Noosa area and the need for alternative routes to reduce congestion on busy main streets.  The package involved construction of

Eenie Creek Road – Stage 2 Read More »

Cooroy to Curra Section A

Cooroy to Curra Section A Project Overview The Cooroy to Curra Section A Contract 2 (Cudgerie Drive to Sankeys Road) project included construction of over 7km of new 4-lane highway, a new all-movements interchange north of Cooroy and new bridges over Skyring Creek, Gardners Road and Evan Thomas Road. The Principal Contractor for the project

Cooroy to Curra Section A Read More »