Lismore Flood Recovery Works
Lismore Flood Recovery Works Updates > Update: September 2025
Lismore Flood Recovery Works Read More »
Lismore Flood Recovery Works Updates > Update: September 2025
Lismore Flood Recovery Works Read More »
Open Level Crossing Removal (Kuraby Package) Updates > Update: February 2025
Open Level Crossing Removal – Kuraby Package Read More »
Coomera Connector Stage 1 Central Updates > 2025 Year in Review > Department of Transport and Main Roads Updates > Update: December 2025 > Update: August 2025 > Update: December 2024
Coomera Connector Stage 1 Central Read More »
Beams Road (Carseldine and Fitzgibbon), upgrade rail level crossing Updates > Department of Transport and Main Roads Updates > Update: October 2025 > Update: February 2025
Beams Road – Rail Level Crossing Upgrade Read More »
Pacific Motorway (M1) Watland Street to Sports Drive Upgrade Project Overview: As principal contractor for the Pacific Motorway (M1) Watland Street to Sports Drive Upgrade, JF Hull in Joint Venture with Bielby Holdings (BHJV) delivered 3.5 km of upgraded motorway and 3 km of new busway infrastructure, enhancing transport connectivity and capacity. Works included six new bridges,
Watland Street to Sports Drive Read More »
O’Keefe Street Veloway Project Overview The Veloway 1 (V1) cycleway is a critical, high quality bike riding facility providing a 17km safe and efficient route for cyclists travelling between Lower River Terrace, South Brisbane and Underwood. A 157m long curved steel girder bridge was built along the motorway embankment and connected to the 99.8m
O’Keefe Street Veloway Read More »
Elizabeth Avenue Pedestrian Overpass Project Overview The Elizabeth Avenue Pedestrain Overpass project involved the construction of a fully enclosed steel truss pedestrian overpass to facilitate safer access for pedestrians across Elizabeth Avenue. As this is a highly trafficked main road, this construction was of particular benefit to the Clontarf Beach State High School which is
Elizabeth Avenue Pedestrian Overpass Read More »
Inland Rail Northern Civil Works Program Project Overview Australian Rail Track Corporation (ARTC) engaged Bielby Hull Q Birt Joint Venture (BHQJV), comprising of Bielby Holdings, JF Hull Holdings and Q.H. & M. Birt on a Collaborative Framework Agreement (CFA) for the Northern Civil Works Program (NCWP) between Gowrie to Whetstone. This project involved the design
Inland Rail Northern Civil Works Program Read More »
Mt Lindesay Highway Upgrade: Stoney Camp Road to Chambers Flat Road Project Overview JF Hull Holdings and SEE Civil worked as a Joint Venture (HullSEE JV) to construct this project for the Department of Transport and Main Roads (TMR), Queensland on a Construct Only Contract. HullSEE JV were awarded this contract in February 2021 for
Mt Lindesay Highway Upgrade Read More »
Cunningham Highway (Ipswich – Warwick) Eight Mile Intersection Upgrade Project Overview This major infrastructure project delivered a new overpass to grade separate Toowoomba-Warwick traffic at the Eight Mile Intersection, located 12.87km north of Warwick. Works included construction of bridge structure, bitumen pavements, a new Toowoomba-to-Brisbane exit lane and intersection, as well as installation of multi-celled
Cunningham Highway – Eight Mile Intersection Read More »