admin

Maritime Museum

Maritime Museum Project Overview The project, for The Department of Public Works, was to replace the existing caisson gate at the Queensland Maritime Museum at Southbank. The existing caisson was badly damaged and had been leaking for a number of years, posing a risk to the decommissioned WW2 frigate HMAS Diamantina (1420t) on low tides.

Maritime Museum Read More »

Centenary Link Alliance

Centenary Link Alliance Project Overview The project consisted of design and construction of Centenary Link between Ipswich Motorway and Garden Road at Richlands, for the Department of Transport and Main Roads (TMR). A four lane dual carriageway (plus localised widening where necessary and future provision for six lanes by widening into the median) and a

Centenary Link Alliance Read More »

Port of Brisbane Flyover

Port of Brisbane Car Precinct Flyover – Fisherman Island Project Overview JF Hull joined with CW-DC Pty Ltd for this design and construct project for the construction of a 15 span bridge. The bridge was part of the relocation of imported car storage from Hamilton to Fisherman Island and joined Wharves 1 and 2 to

Port of Brisbane Flyover Read More »

Coombabah Water

Coombabah Water Futures Project Project Overview The Coombabah Water Futures Project was an alliance between Gold Coast Water, Gold Coast City Council and KBR Pty Ltd, and was initiated to upgrade the existing wastewater system in the Helenvale, Hope Island and Coombabah areas to meet the growing demand of the Gold Coast. As part of

Coombabah Water Read More »

Eenie Creek Road – Stage 2

Eenie Creek Road Stage 2 Project Overview Eenie Creek Road Project was an initiative between Queensland Department of Main Roads and Noosa Council. The project was necessary due to the growth and popularity of the Noosa area and the need for alternative routes to reduce congestion on busy main streets.  The package involved construction of

Eenie Creek Road – Stage 2 Read More »

Wynnum Creek Railway Bridge

Reconstruction of Wynnum Creek Railway Bridge Project Overview The Wynnum Creek Railway Bridge, at Colina St Wynnum, was reconstructed as part of Queensland Rail’s Timber Bridge Replacement Program. The existing bridge was a 9 span timber bridge with a 2 span post-tensioned concrete bridge. This was replaced with a 2 span post tensioned concrete bridge

Wynnum Creek Railway Bridge Read More »

Cooroy to Curra Section A

Cooroy to Curra Section A Project Overview The Cooroy to Curra Section A Contract 2 (Cudgerie Drive to Sankeys Road) project included construction of over 7km of new 4-lane highway, a new all-movements interchange north of Cooroy and new bridges over Skyring Creek, Gardners Road and Evan Thomas Road. The Principal Contractor for the project

Cooroy to Curra Section A Read More »

Wharf 8

Fisherman Island – Wharf 8 Project Overview The project consisted of the construction of a new continuous wharf, approximately 210m long and 29m wide, a relieving slab of the same length x 6.37m wide supported on an abutment constructed on top of an existing rock wall. The new wharf is a cast insitu reinforced concrete

Wharf 8 Read More »